J&D Refrigerated Services

2012

Clackamas, OR

General Contractor:  Perlo McCormack

Scope:  The site development for a new 141,280 square foot concrete tilt-up building.  The project includes 8.1 acres of erosion control, mass excavation, site grading, cement amendment of subgrade soils and full underground utilities (storm/water/sewer).  VCI excavated and placed 33,000 cy of native fill, of which some was screened and crushed on-site for use as aggregate vase material.  There are two large planted infiltration ponds located on-site which will absorb the site storm water run off.